Readying Electrical conduits for the Foundation

There's a break in the storms and today's a beautiful sunny day. Rob's up working on getting the electrical conduit in so the foundation can be poured over it. Yesterday he was able to work a bit before it rained and get the conduit that goes under the garage from the main service panel to the utility room subpannel locatio. He also got all the conduit bent so its ready to install. Today he's working on digging out the sand that was put down to go under the concrete for the conduit runs to the great room, lower master bedroom and other key locations that benefit from an underground run.

The foundation contractor is looking at Thursday or Friday to pour the concrete. However, Thursday is supposed to be another raining day, so it's more likely to be Friday or next week.